Slant_fin EC-10 Assembly Instructions Manual de usuario Pagina 11

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 12
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 10
11
16
Final levelling of the boiler
- Level the boiler by adjusting its adjustable feet (preins-
talled on the base).
(1) basic height 1”,
adjustment range : 1” – 1-9/16”
N
5758
A5
3
0
1”
(1)
19
19
1”
(1)
15
Assembling the front cap
Lift the window.
Attach the front cap in the openings near the bot-
tom of the side panels.
Slide the two lugs of the front cap into the notches
of the side panels and then fix it in the two spring clips.
Push the front cap into contact with the side panels
and fix it using the two black RLS M 6 x 10 screws
(S/F part no. 470128000) (delivered in the casing screw bag).
4
2
1
3
3
4
Vista de pagina 10
1 2 ... 6 7 8 9 10 11 12

Comentarios a estos manuales

Sin comentarios